Planned | No. | Milestone | Short text |
1 | Examples of OP Beans assembly in OP Frame. | Application Prototypes | |
07/2000 | 2.1 | Standard Frame defined. | OPSkel |
07/2000 | 2.2 | Standard Beans defined. | OPBeans |
07/2000 | 2.3 | Standard LookAndFeel defined. | OPLookAndFeel |
10/2000 | 3 | Callback Interface defined. | Callback Interface |
11/2000 | 4.1 | First prototype done. | Prototype |
11/2000 | 4.2 | Tool installation for common use. | Tool installation |
02/2001 | 5 | User Guide written. | User Guide |
? | 5.1 | Syntax defined. | Syntax |
? | 5.2 | Code Generator defined. | Code Generator |
04/2001 | 6 | First operational version available. | First version |
7 | Training of operators and developers. | Training | |
8 | Basis SPS2001 applications built with the tool. | SPS2001 applications. | |
8.1 | Basis CESAR applications built with the tool. | CESAR applications. |
2nd Phase : Console Management